Thu, May 22, 2025
Wed, May 21, 2025
Tue, May 20, 2025
Mon, May 19, 2025
Sun, May 18, 2025
Sat, May 17, 2025
[ Sat, May 17th ] - wjla
My India, May 17
Fri, May 16, 2025
Thu, May 15, 2025
[ Thu, May 15th ] - WSAZ
Memorial Day entertaining
Wed, May 14, 2025
Tue, May 13, 2025
Mon, May 12, 2025
Sun, May 11, 2025

Frustrated by pace of power plant approval, Matt Huffman entertains leaving PJM: Capitol Letter


//media-entertainment.news-articles.net/content/ .. ffman-entertains-leaving-pjm-capitol-letter.html
Published in Media and Entertainment on Tuesday, May 13th 2025 at 8:44 GMT by   Print publication without navigation

  • PJM Interconnection is a massive network that helps power 13 states and Washington, D.C.

Ohio Senate President Matt Huffman expressed frustration with the slow pace of power plant approvals in Ohio, suggesting that the state might consider leaving the regional grid operator PJM Interconnection to expedite the process. During a legislative hearing, Huffman criticized the lengthy delays in approving new power plants, which he believes are hindering economic development. He mentioned that leaving PJM could be an option if the situation does not improve, although he acknowledged the complexity and potential challenges of such a move. This discussion comes amid broader concerns about energy policy and infrastructure in the state, with some lawmakers advocating for reforms to streamline the approval process for new energy projects.

Read the Full Cleveland.com Article at:
[ https://www.cleveland.com/open/2025/05/frustrated-by-pace-of-power-plant-approval-matt-huffman-entertains-leaving-pjm-capitol-letter.html ]